prBAS EN 17921:2025
Natural gas fuelling stations - LNG unloading connector
Opšte informacije
Status:Projekt
Broj stranica:10
Metoda usvajanja:Proglašavanje
Jezik:engleski
Izdanje:1.
Datum realizacije:21.10.2024
Predviđeni datum naredne faze:28.10.2024
Tehnički komitet:BAS/TC 31, Gas i gasna tehnika
Direktive:
2014/94/EU, Directive 2014/94/EU of The European Parliament and of The Council of 22 October 2014 on the deployment of alternative fuels infrastructure
ICS:
43.080.10, Kamioni i prikolice
75.200, Nafta, naftni proizvodi i oprema za rukovanje prirodnim gasom
75.200, Nafta, naftni proizvodi i oprema za rukovanje prirodnim gasom
Apstrakt
This document specifies a harmonized unloading connector for LNG road tanker at LNG fuelling stations. This document is also applicable to LNG RID applications. While LNG is also transported by rail, European regulations are organized through the International Carriage of Dangerous Goods by Rail (RID). The same configuration as defined by this document, can be utilized. This document includes requirements for (at least):
- functional description of the LNG unloading receptacle and LNG unloading nozzle;
- technical layout description of the LNG unloading receptacle.
The technical layout description of the LNG unloading nozzle is not part of this document.
The basic functional requirement of the LNG unloading connector are as follows:
- to prevent leakage of methane during operation and in particular during disconnecting;
- easy handling, no spillage and purging with nitrogen during disconnecting.
The loading connector between the LNG road tanker and the LNG terminal is not covered by this document.
See Figure 1.
Životni ciklus
...
Izvorni dokument i stepen usklađenosti
EN 17921:2024, identičan
Radni materijal
Samo članovi tehničkog komiteta imaju pristup radnom materijalu. Ukoliko ste član, molimo prijavite se sa vašim nalogom i dobićete pristup dokumentima. Prijavite se