Showing 21-40 of 463 items.
Standard referenceStage codeBAS/TCReal dateForseen date for next stage code
  
pnBAS CEN/TS 17217:2025
Postal services - Reverse envelope - Design and printing requirements
30.20BAS/TC 503.09.202510.09.2025
pnBAS CEN/TS 18055-1:2025
Postal services - Harmonized track and trace events - Part 1: Forward flow
30.20BAS/TC 503.09.202510.09.2025
pnBAS CLC/TR 50658:2025
Cable management systems (CMS) providing support for cables with intrinsic fire resistance
30.20BAS/TC 3008.09.202515.09.2025
pnBAS CLC/TS 50600-4-31:2025
Information technology - Data centre facilities and infrastructures - Part 4-31: Key performance indicators for Resilience
30.20BAS/TC 503.09.202510.09.2025
pnBAS CLC/TS 50600-5-1:2025
Information technology - Data centre facilities and infrastructures - Part 5-1: Maturity Model for Energy Management and Environmental Sustainability
30.20BAS/TC 503.09.202510.09.2025
pnBAS CLC/TS 50659:2025
Electromagnetic characteristics of linear cable management systems (CMS)
30.20BAS/TC 3008.09.202515.09.2025
pnBAS EN 1022:2025
Furniture - Seating - Determination of stability
30.20BAS/TC 4212.03.202512.04.2025
pnBAS EN 12259-14+A2:2025
Fixed firefighting systems - Components for sprinkler and water spray systems - Part 14: Sprinklers for residential applications
30.20BAS/TC 1307.08.202517.09.2025
pnBAS EN 12416-1:2025
Fixed firefighting systems - Powder systems - Part 1: Requirements and test methods for components
30.20BAS/TC 1307.08.202517.09.2025
pnBAS EN 12521:2025
Furniture - Safety, strength and durability - Requirements for domestic tables
30.20BAS/TC 4227.08.202527.09.2025
pnBAS EN 12845-2:2025
Fixed firefighting systems - Automatic sprinkler systems - Part 2: Design and installation of ESFR and CMSA sprinkler systems
30.20BAS/TC 1307.08.202517.09.2025
pnBAS EN 12845-3:2025
Fixed firefighting systems - Automatic sprinkler systems - Part 3: Guidance for earthquake bracing
30.20BAS/TC 1307.08.202517.09.2025
pnBAS EN 13757-2+A1:2025
Communication systems for meters - Part 2: Wired M-Bus communication
30.20BAS/TC 503.09.202510.09.2025
pnBAS EN 13757-8:2025
Communication systems for meters - Part 8: Adaptation layer
30.20BAS/TC 503.09.202510.09.2025
pnBAS EN 14534:2025
Postal services - Quality of service - Measurement of the transit time of end-to-end services for bulk mail
30.20BAS/TC 503.09.202510.09.2025
pnBAS EN 14972-12:2025
Fixed firefighting systems - Water mist systems - Part 12: Test protocol for commercial deep fat cooking fryers for manually activated open nozzle systems
30.20BAS/TC 1307.08.202517.09.2025
pnBAS EN 14972-4:2025
Fixed firefighting systems - Water mist systems - Part 4: Test protocol for non-storage occupancies for automatic nozzle systems
30.20BAS/TC 1307.08.202517.09.2025
pnBAS EN 15004-11:2025
Fixed firefighting systems - Gas extinguishing systems - Part 11: Physical properties and systems design of gas extinguishing systems for Halocarbon Blend 55 extinguishant
30.20BAS/TC 1307.08.202517.09.2025
pnBAS EN 16986:2025
Electronic fee collection - Interoperable application profiles for information exchange between service provision and toll charging
30.20BAS/TC 104.09.202517.09.2025
pnBAS EN 17184:2025
Intelligent transport systems — eSafety — eCall High level application protocols (HLAP) using IP Multimedia Subsystem (IMS) over packet switched networks
30.20BAS/TC 104.09.202517.09.2025