BAS standards at public enquiry
Institute for Standardization of Bosnia and Herzegovina, on the proposal of BAS technical committees, announces a public enquiry on draft national standards (stage code 40.20).
Deadline for submission of comments on draft national standards is 60 days from the publication of the enquiry on the Institute's website (if necessary, it can be shortened to no less than 30 days).
The drafts of BAS standards are available to our stakeholders via online module for reading the draft of BAS standards, and basic information about the draft (title, scope, technical committee that prepared the draft for public discussion, etc.) is available on the ISBIH website.
The request for access to the draft BAS standard at the public enquiry should be sent to email: stand@isbih.gov.ba. To be able to access the online module for reading the draft BAS standards, you must be registered on our website.
Written comments on the draft national standards (with the designation of BAS technical committee and the reference designation of the BAS draft standards) shall be submitted to the Institute.
To fill this form correctly, see the Comment Form Use Guide.
Standard reference | Stage code | BAS/TC | Real date | Forseen date for next stage code |
---|---|---|---|---|
nsBAS EN IEC 62453-2:2024 Field device tool (FDT) interface specification - Part 2: Concepts and detailed description | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |
nsBAS EN IEC 62453-309:2024 Field device tool (FDT) interface specification - Part 309: Communication profile integration - IEC 61784 CPF 9 | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |
nsBAS EN IEC 62474/A1:2024 Material declaration for products of and for the electrotechnical industry | 40.20 | BAS/TC 7 | 17.05.2024 | 17.07.2024 |
nsBAS EN IEC 62474:2024 Material declaration for products of and for the electrotechnical industry | 40.20 | BAS/TC 7 | 17.05.2024 | 17.07.2024 |
nsBAS EN IEC 62682:2024 Management of alarm systems for the process industries | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |
nsBAS EN IEC 62714-2:2024 Engineering data exchange format for use in industrial automation systems engineering - Automation markup language - Part 2: Semantics libraries | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |
nsBAS EN IEC 62714-4/Cor1:2024 Engineering data exchange format for use in industrial automation systems engineering - Automation markup language - Part 4: Logic | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |
nsBAS EN IEC 62769-1:2024 Field Device Integration (FDI®) - Part 1: Overview | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |
nsBAS EN IEC 62769-100:2024 Field device integration (FDI®) - Part 100: Profiles - Generic protocols | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |
nsBAS EN IEC 62769-101-1:2024 Field device Integration (FDI)® - Part 101-1: Profiles - Foundation Fieldbus H1 | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |
nsBAS EN IEC 62769-101-2:2024 Field Device Integration (FDI)® - Part 101-2: Profiles - Foundation Fieldbus HSE | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |
nsBAS EN IEC 62769-103-1:2024 Field Device Integration (FDI)® - Part 103-1: Profiles - PROFIBUS | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |
nsBAS EN IEC 62769-103-4:2024 Field Device Integration (FDI)® - Part 103-4: PROFINET | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |
nsBAS EN IEC 62769-109-1:2024 Field device integration (FDI)® - Part 109-1: Profiles - HART® and WirelessHART® | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |
nsBAS EN IEC 62769-150-1:2024 Field device integration (FDI)® - Part 150-1: Profiles - ISA100 | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |
nsBAS EN IEC 62769-151-1:2024 Field device integration (FDI®) - Part 151-1: Profiles - OPC UA | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |
nsBAS EN IEC 62769-2:2024 Field Device Integration (FDI®) - Part 2: Client | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |
nsBAS EN IEC 62769-3:2024 Field Device Integration (FDI®) - Part 3: Server | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |
nsBAS EN IEC 62769-4:2024 Field Device Integration (FDI®) - Part 4: FDI Packages | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |
nsBAS EN IEC 62769-5:2024 Field Device Integration (FDI®) - Part 5: FDI Information Model | 40.20 | BAS/TC 51 | 24.04.2024 | 16.06.2024 |