Showing 1,681-1,700 of 3,176 items.
| Standard reference | Stage code | BAS/TC | Real date | Forseen date for next stage code |
|---|---|---|---|---|
| prBAS EN IEC 61400-4:2026 Wind energy generation systems - Part 4: Design requirements for wind turbine gearboxes | 10.99 | BAS/TC 56 | 13.11.2025 | 15.01.2026 |
| prBAS EN IEC 61400-5/A1:2026 Wind energy generation systems - Part 5: Wind turbine blades | 10.99 | BAS/TC 56 | 13.11.2025 | 15.01.2026 |
| prBAS EN IEC 61400-6/A1:2026 Wind energy generation systems - Part 6: Tower and foundation design requirements | 10.99 | BAS/TC 56 | 13.11.2025 | 15.01.2026 |
| prBAS EN IEC 61439-5/Cor1:2026 Low-voltage switchgear and controlgear assemblies - Part 5: Assemblies for power distribution in public networks | 10.99 | BAS/TC 52 | 18.11.2025 | 15.01.2026 |
| prBAS EN IEC 61496-3:2026 Safety of machinery - Electro-sensitive protective equipment - Part 3: Particular requirements for active opto-electronic protective devices responsive to diffuse reflection (AOPDDR) | 10.99 | BAS/TC 40 | 28.11.2025 | 23.03.2026 |
| prBAS EN IEC 61554:2026 Panel mounted equipment - Electrical measuring instruments - Dimensions for panel mounting | 00.99 | BAS/TC 10 | 23.10.2025 | 05.11.2025 |
| prBAS EN IEC 61557-1/A1:2026 Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 1: General requirements | 00.99 | BAS/TC 10 | 23.10.2025 | 05.11.2025 |
| prBAS EN IEC 61557-10:2026 Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 10: Combined measuring equipment for testing, measuring and monitoring of protective measures | 00.99 | BAS/TC 10 | 23.10.2025 | 05.11.2025 |
| prBAS EN IEC 61557-9:2026 Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 9: Equipment for insulation fault location in IT systems | 00.99 | BAS/TC 10 | 23.10.2025 | 05.11.2025 |
| prBAS EN IEC 61558-2-1:2026 Safety of transformers, reactors, power supply units and combinations thereof - Part 2-1: Particular requirements and tests for separating transformers and power supplies incorporating separating transformers for general applications | 10.99 | BAS/TC 18 | 03.12.2025 | 11.02.2026 |
| prBAS EN IEC 61558-2-12:2026 Safety of transformers, reactors, power supply units and combination thereof - Part 2-12: Particular requirements and tests for constant voltage transformers and power supply units for constant voltage | 10.99 | BAS/TC 18 | 03.12.2025 | 11.02.2026 |
| prBAS EN IEC 61558-2-13:2026 Safety of transformers, reactors, power supply units and combinations thereof - Part 2-13: Particular requirements and tests for auto-transformers and power supply units incorporating auto-transformers for general applications | 10.99 | BAS/TC 18 | 03.12.2025 | 11.02.2026 |
| prBAS EN IEC 61558-2-14:2026 Safety of transformers, reactors, power supply units and combinations thereof - Part 2-14: Particular requirements and tests for variable transformers and power supply units incorporating variable transformers for general applications | 10.99 | BAS/TC 18 | 03.12.2025 | 11.02.2026 |
| prBAS EN IEC 61558-2-15:2026 Sicherheit von Transformatoren, Drosseln, Netzgeräten und deren Kombinationen - Teil 2-15: Besondere Anforderungen und Prüfungen für Trenntransformatoren für medizinische IT-Systeme zur Versorgung medizinischer Räumlichkeiten | 10.99 | BAS/TC 18 | 03.12.2025 | 11.02.2026 |
| prBAS EN IEC 61558-2-16:2026 Safety of transformers, reactors, power supply units and combinations thereof - Part 2-16: Particular requirements and tests for switch mode power supply units and transformers for switch mode power supply units for general applications | 10.99 | BAS/TC 18 | 03.12.2025 | 11.02.2026 |
| prBAS EN IEC 61558-2-2:2026 Safety of transformers, reactors, power supply units and combinations thereof - Part 2-2: Particular requirements and tests for control transformers and power supply units incorporating control transformers | 10.99 | BAS/TC 18 | 03.12.2025 | 11.02.2026 |
| prBAS EN IEC 61558-2-20:2026 Safety of transformers, reactors, power supply units and combinations thereof - Part 2-20: Particular requirements and tests for small reactors | 10.99 | BAS/TC 18 | 03.12.2025 | 11.02.2026 |
| prBAS EN IEC 61558-2-23:2026 Safety of transformers, reactors, power supply units and combinations thereof - Part 2-23: Particular requirements and tests for transformers and power supply units for construction sites | 10.99 | BAS/TC 18 | 03.12.2025 | 11.02.2026 |
| prBAS EN IEC 61558-2-3:2026 Safety of transformers, reactors, power supply units and combinations thereof - Part 2-3: Particular requirements and tests for ignition transformers for gas and oil burners | 10.99 | BAS/TC 18 | 03.12.2025 | 11.02.2026 |
| prBAS EN IEC 61558-2-4:2026 Safety of transformers, reactors, power supply units and combinations thereof - Part 2-4: Particular requirements and tests for isolating transformers and power supply units incorporating isolating transformers for general applications | 10.99 | BAS/TC 18 | 03.12.2025 | 11.02.2026 |