Showing 1,601-1,620 of 1,914 items.
Standard referenceStage codeBAS/TCReal dateForseen date for next stage code
  
prBAS EN ISO 9706:2026
Information and documentation - Paper for documents - Requirements for permanence (ISO 9706:2025)
10.99BAS/TC 4203.11.202529.12.2025
prBAS EN ISO/ASTM 52919:2026
Additive manufacturing - Qualification principles - Test methods for metal casting sand moulds (ISO/ASTM 52919:2025)
00.99BAS/TC 1709.10.202520.10.2025
prBAS EN ISO/ASTM 52938-1:2026
Additive manufacturing of metals - Environment, health and safety - Part 1: Safety requirements for PBF-LB machines (ISO/ASTM 52938-1:2025)
00.99BAS/TC 1709.10.202520.10.2025
prBAS EN ISO/ASTM 52953:2026
Additive manufacturing for metals - General principles - Registration of data acquired from process monitoring and for quality control (ISO/ASTM 52953:2025)
00.99BAS/TC 1709.10.202520.10.2025
prBAS Glasanje ISO/CASCO
10.99BAS/TC 305.05.202118.05.2021
prBAS Glasanje na razvoj ISO standarda
00.99BAS/TC 3119.12.201909.05.2022
prBAS Glasanje na razvoj ISO standarda
00.99BAS/TC 6628.02.202202.03.2022
prBAS Glasanje na razvoj ISO standarda
00.99BAS/TC 4306.05.202106.07.2022
prBAS IEC 61727:2026
Photovoltaic (PV) systems - Characteristics of the utility interface
00.99BAS/TC 5630.10.202511.11.2025
prBAS IEC 62270:2026
Guide for computer-based control for hydroelectric power plant automation
00.99BAS/TC 5630.10.202511.11.2025
prBAS IEC 62271-111:2026
High-voltage switchgear and controlgear - Part 111: Automatic circuit reclosers for alternating current systems up to and including 38 kV
00.99BAS/TC 5230.10.202506.11.2025
prBAS IEC 62548-1:2026
Photovoltaic (PV) arrays - Part 1: Design requirements
00.99BAS/TC 5630.10.202511.11.2025
prBAS IEC 62746-10-3:2026
Systems interface between customer energy management system and the power management system - Part 10-3: Open automated demand response - Adapting smart grid user interfaces to the IEC common information model
00.99BAS/TC 5630.10.202511.11.2025
prBAS IEC 62788-7-3:2026
Measurement procedures for materials used in photovoltaic modules - Part 7-3: Accelerated stress tests - Methods of abrasion of PV module external surfaces
00.99BAS/TC 5630.10.202511.11.2025
prBAS IEC 62862-1-5:2026
Solar thermal electric plants - Part 1-5: Performance test code for solar thermal electric plants
00.99BAS/TC 5630.10.202511.11.2025
prBAS IEC 62862-1-6:2026
Solar thermal electric plants - Part 1-6: Silicone-based heat transfer fluids for use in line-focus concentrated solar power applications
00.99BAS/TC 5630.10.202511.11.2025
prBAS IEC 62862-3-1:2026
Solar thermal electric plants - Part 3-1: Systems and components - General requirements for the design of parabolic-trough solar thermal power plants
00.99BAS/TC 5630.10.202511.11.2025
prBAS IEC 63092-1:2026
Photovoltaics in buildings - Part 1: Requirements for building-integrated photovoltaic modules
00.99BAS/TC 5630.10.202511.11.2025
prBAS IEC 63092-2:2026
Photovoltaics in buildings - Part 2: Requirements for building-integrated photovoltaic systems
00.99BAS/TC 5630.10.202511.11.2025
prBAS IEC TR 60071-4:2026
Insulation co-ordination - Part 4: Computational guide to insulation co-ordination and modelling of electrical networks
00.99BAS/TC 5230.10.202506.11.2025