Glossary of standardization terms
Showing 2,661-2,680 of 11,126 items.
Standardization field | Term | Term (EN) | Technical committee | |
---|---|---|---|---|
Electrical engineering | time programme | time programme | BAS/TC 18 | Details |
Electrical engineering | setting value of a specified time | setting value of a specified time | BAS/TC 18 | Details |
Electrical engineering | actual value of a specified time | actual value of a specified time | BAS/TC 18 | Details |
Electrical engineering | intrinsic error | intrinsic error | BAS/TC 10 | Details |
Electrical engineering | setting range of a specified time sation | setting range of a specified time sation | BAS/TC 18 | Details |
Electrical engineering | variation | variation | BAS/TC 10 | Details |
Electrical engineering | setting ratio of a specified time | setting ratio of a specified time | BAS/TC 18 | Details |
Electrical engineering | fiducial error | fiducial error | BAS/TC 10 | Details |
Electrical engineering | error in timekeeping | error in timekeeping | BAS/TC 10 | Details |
Electrical engineering | maximum resetting time | maximum resetting time | BAS/TC 18 | Details |
Electrical engineering | accuracy | accuracy | BAS/TC 10 | Details |
Electrical engineering | recovery time | recovery time | BAS/TC 18 | Details |
Electrical engineering | accuracy class | accuracy class | BAS/TC 10 | Details |
Electrical engineering | bridging time | bridging time | BAS/TC 18 | Details |
Electrical engineering | measuring class index | measuring class index | BAS/TC 10 | Details |
Electrical engineering | timekeeping class index | timekeeping class index | BAS/TC 10 | Details |
Electrical engineering | transit time | transit time | BAS/TC 18 | Details |
Electrical engineering | time to stable closed [open] condition | time to stable closed [open] condition | BAS/TC 18 | Details |
Electrical engineering | contact time difference | contact time difference | BAS/TC 18 | Details |
Electrical engineering | absolute error | absolute error | BAS/TC 18 | Details |