Glossary of standardization terms
Showing 2,641-2,660 of 11,126 items.
Standardization field | Term | Term (EN) | Technical committee | |
---|---|---|---|---|
Electrical engineering | opening time of a break contact [out- put-break circuit] | opening time of a break contact [out- put-break circuit] | BAS/TC 18 | Details |
Electrical engineering | recorder with zero displacement | recorder with zero displacement | BAS/TC 10 | Details |
Electrical engineering | closing time of a make contact [output-make circuit] | closing time of a make contact [output-make circuit] | BAS/TC 18 | Details |
Electrical engineering | influence quantity | influence quantity | BAS/TC 10 | Details |
Electrical engineering | opening time of a make contact [output-make circuit] | opening time of a make contact [output-make circuit] | BAS/TC 18 | Details |
Electrical engineering | reference conditions | reference conditions | BAS/TC 10 | Details |
Electrical engineering | closing time of a break contact [output-break circuit) | closing time of a break contact [output-break circuit) | BAS/TC 18 | Details |
Electrical engineering | reference value | reference value | BAS/TC 10 | Details |
Electrical engineering | reference range | reference range | BAS/TC 10 | Details |
Electrical engineering | operate time | operate time | BAS/TC 18 | Details |
Electrical engineering | nominal range of use | nominal range of use | BAS/TC 10 | Details |
Electrical engineering | limiting values of an influence quantity | limiting values of an influence quantity | BAS/TC 10 | Details |
Electrical engineering | preconditioning | preconditioning | BAS/TC 10 | Details |
Electrical engineering | release time | release time | BAS/TC 18 | Details |
Electrical engineering | preliminary adjustments | preliminary adjustments | BAS/TC 10 | Details |
Electrical engineering | disengaging time (for a given function | disengaging time (for a given function | BAS/TC 18 | Details |
Electrical engineering | (Absolute) error | (Absolute) error | BAS/TC 10 | Details |
Electrical engineering | resetting time | resetting time | BAS/TC 18 | Details |
Electrical engineering | bounce time | bounce time | BAS/TC 18 | Details |
Electrical engineering | specified time | specified time | BAS/TC 18 | Details |