Standardization field | Electrical engineering
|
Technical committee | BAS/TC 18- Power transformers, measuring relays and protective equipment |
Term (EN) | bounce time |
Definition (EN) | For a contact which is closing (opening) its circuit,
the time interval between the instant when the contact
circuit first closes (opens) and the instant when the
circuit is finally closed (opened). |
Term (FR) | |
Definition (FR) | |
Term (DE) | |
Definition (DE) | |
Term (BS) | vrijeme odskakanja |
Definition (BS) | Za neki kontakt koji zatvara (otvara) svoj krug,
vremenski interval između trenutka kada se kontakt
kruga prvi put zatvara (otvara) i trenutka kada se
krug konačno zatvorio (otvorio). |
Term (HR) | |
Definition (HR) | |
Term (SR) | |
Definition (SR) | |
Date | 2016-02-16 |
Standards | BAS IEC 60050-446:2005 |
---|