prBAS EN 17240:2025
Intelligent transport systems - ESafety - ECall end to end conformance testing for IMS packet switched based systems
General information
Status:Project
Number of pages:0
Adoption method:Proglašavanje
Edition:1.
Realization date:24.01.2025
Forseen date for next stage code:30.01.2025
Technical committee:BAS/TC 1, Information technology
ICS:
35.240.60, IT applications in transport and trade
Abstract
This document defines the key actors in the eCall chain of service provision using IMS over packet switched networks (such as LTE/4G) as:
1) In-vehicle system (3.20) (IVS)/vehicle,
2) Mobile network Operator (MNO),
3) Public safety answering point (3.27) (PSAP),
and to provide conformance tests for actor groups 1) - 3).
NOTE 1 Conformance tests are not appropriate nor required for vehicle occupants (3.36), although they are the recipient of the service.
NOTE 2 Third party eCall systems (TPS eCall) are not within the scope of this deliverable. This is because the core TPS-eCall (3.32) standard (EN 16102) does not specify the communications link between the vehicle and the TPS service provider (3.29).
NOTE 3 These conformance tests are based an the appropriate conformance tests from EN 16454 which was published before Internet Protocol multimedia Systems (IMS) packet switched networks were available. This deliverable therefore replicates the appropriate tests from EN 16454 (and acknowledge their source); adapt and revise Conformance Test Protocols (CTP) from EN 16454 to an IMS paradigm; or provide new additional tests that are required for the IMS paradigm. Some 14 112-eCall (Pan European eCall) tests provided in EN 16454 are specific to GSM/UMTS circuit switched communications and not appropriate for the IMS paradigm and are therefore excluded from this deliverable.
This document therefore provides a suite of ALL conformance tests for IVS equipment, MNO's, and PSAPS, required to ensure and demonstrate compliance to CEN/TS 17184.
NOTE 4 Because in the event of non-viability or non-existence of an IMS supporting network at any particular time/location, IMS-eCall systems revert to CS networked eCall systems eCall via GSM/UMTS, IVS and PSAPs need to support, and prove compliance to both IMS and CS switched networks.
The Scope covers conformance testing (and approval) of new engineering developments, products and systems, and does not imply testing associated with individual installations in vehicles or locations.
Lifecycle
...
Original document and degree of correspondence
EN 17240:2024, identical
Relation to BAS standards
Work material
Only members of the technical committee have access to work material. If you are a members of this technical committee you need to login to view the documents. Login