prBAS EN IEC 61784-5-19:2025
Industrial networks - Profiles - Part 5-19: Installation of fieldbuses - Installation profiles for CPF 19
General information
Status:Project
Number of pages:0
Adoption method:Proglašavanje
Edition:1.
Realization date:23.12.2024
Forseen date for next stage code:01.01.2025
Technical committee:BAS/TC 51, Automation
ICS:
25.040.40, Industrial process measurement and control
35.100.40, Transport layer
35.100.40, Transport layer
Abstract
<!-- NEW! -->IEC 61784-5-19:2024 is available as <a href="https://webstore.iec.ch/publication/93717">IEC 61784-5-19:2024 RLV</a> which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.</br></br>IEC 61784-5-19:2024 specifies the installation profile for CPF 19 (MECHATROLINKTM[1]). The installation profiles are specified in the annexes. These annexes are read in conjunction with IEC 61918:2018, IEC 61918:2018/AMD1:2022 and IEC 61918:2018/AMD2:2024.
[1] MECHATROLINKTM and Σ-LINKTM II are trade names of YASKAWA ELECTRIC CORPORATION. This information is given for the convenience of users of this document and does not constitute an endorsement by IEC of the trade names holder or any of its products. Compliance to this profile does not require use of the trade names. Use of the trade name requires permission of the trade name holder.
Lifecycle
...
Original document and degree of correspondence
EN IEC 61784-5-19:2024, identical
Relation to BAS standards
Work material
Only members of the technical committee have access to work material. If you are a members of this technical committee you need to login to view the documents. Login