BAS EN IEC 63132-5:2024

Guidance for installation procedures and tolerances of hydroelectric machines - Part 5: Bulb turbines and generators


General information
Status:Project
Number of pages:42
Adoption method:Proglašavanje
Language:engleski
Edition:1.
Realization date:08.05.2024
Forseen date for next stage code:14.05.2024
Technical committee:BAS/TC 56, Conventional and alternative sources of electrical energy
ICS:
27.140, Hydraulic energy engineering

Abstract
The purpose of this guide is to establish, in a general way, suitable procedures and tolerances for the installation of bulb turbine and generator. This guide presents a typical assembly and whenever the words "turbine" and "generator" are used in this part, it refers to bulb turbine and generator. There are many possible ways to assemble a unit. The size of the machine, the design of the machine, the layout of the powerhouse, the sequence of concreting or the delivery schedule of the components are some of the elements that could result in additional steps, or the elimination of some steps and/or assembly sequences. It is understood that a publication of this type will be binding only if, and to the extent that, both contracting parties have agreed upon it. The guide excludes matters of purely commercial interest, except those inextricably bound up with the conduct of installation. It also excluded to specifications of the civil works but this aspect of the work should be taken into consideration during the assembly of the units. Wherever the guide specifies that documents, drawings or information is supplied by a manufacturer (or by manufacturers), each individual manufacturer will furnish the appropriate information for their own supply only.

Lifecycle
...

Original document and degree of correspondence
EN IEC 63132-5:2023, identical
IEC 63132-5:2023, identical

Work material

Only members of the technical committee have access to work material. If you are a members of this technical committee you need to login to view the documents. Login