BAS CLC/TR 50451:2011

Railway applications - Systematic allocation of safety integrity requirements


General Information
Status: Withdrawn
No. of pages: 87
Language: English
Edition: 1.
Adoption method: Endorsment
Publication date: 12.05.2011
Technical committee:
...

Abstract
The scope of this Technical Report is to define a method to determine the required Safety Integrity Level of railway signalling equipment taking in consideration • the operational conditions of the railway, and • the architecture of the signalling system. From a mechanistic point of view the task of this Technical Report is to define a method of calculation, which determines the integrity requirements (qualitatively and quantitatively) from the inputs stated above.

Lifecycle
...

Original document and degree of correspondence
  • CLC/TR 50451:2007, identical

Relation to BAS standards