prBAS IEC TS 61724-2:2027
Photovoltaic system performance - Part 2: Power performance index and capacity evaluation method
General information
Status:Project
Number of pages:26
Adoption method:Proglašavanje
Language:engleski
Edition:2.
Realization date:29.10.2026
Forseen date for next stage code:18.11.2026
Technical committee:BAS/TC 56, Conventional and alternative sources of electrical energy
ICS:
27.160, Solar energy engineering
Abstract
IEC TS 61724-2:2025 applies to grid-connected PV systems comprising at least one inverter.<br />
The test evaluates the PV system only in conditions where output is unconstrained by limitations in AC power output from the inverters. This document defines a test of a PV system's power performance index (PPI). PPI, defined in IEC 61724‑1, is the ratio of a system's measured power output under test conditions to its expected output at those conditions based on the system's design.<br />
The test is intended to be performed over a short period of typically three to five days and is typically used to satisfy a contractual performance guarantee as part of the final completion of a PV power plant. This second edition cancels and replaces the first edition published in 2016. This edition includes the following significant technical changes with respect to the previous edition:<br />
a) Adapting the document for bifacial PV systems, in accordance with the latest edition of IEC 61724‑1 and current industry practices.<br />
b) Adapting the test procedure to account for the limited times of unconstrained system operation which are now common because of high DC-to-AC ratios (clipping) and interconnection limits (curtailment).<br />
c) Adapting the test procedure to achieve a test that can be performed in a short time of three to five days during favourable conditions.<br />
d) Focusing the document more heavily on the use of modern PV system modelling software to obtain the expected performance of the system under test.<br />
e) Simplifying the mathematical procedure for calculating the test results.<br />
f) Clearly identifying test elections (optional choices to be made in conducting the test) and providing a template for documenting these elections.<br />
g) Clarifying the discussion of the test boundary that separates tested variables from untested variables.<br />
h) Expanding and clarifying the discussion of data filtering.
Lifecycle
...
Original document and degree of correspondence
IEC TS 61724-2:2025, identical