prBAS IEC TS 61400-28:2027

Wind energy generation systems - Part 28: Through-life management and life extension of wind power assets


General information
Status:Project
Number of pages:108
Adoption method:Proglašavanje
Language:engleski
Edition:1.
Realization date:29.10.2026
Forseen date for next stage code:18.11.2026
Technical committee:BAS/TC 56, Conventional and alternative sources of electrical energy
ICS:
27.180, Wind turbine energy systems

Abstract
IEC TS 61400-28:2025 sets out minimum requirements for actions, investigations and assessments to ensure the continued structural integrity of wind farm assets, particularly wind turbines, aimed at verifying that they remain safe for personnel to operate. The document describes how to maintain those assets and collect suitable evidence to demonstrate to third parties that risks are minimised, particularly where risks are related to collateral damage or injury, such as could be suffered by personnel or structures neighbouring the wind farm. Covered in this document are assessments of current condition and remaining useful life, resulting in the technical basis for justifying extended operation beyond the design life (defined in 3.1.3) and also beyond the site-specific assessed lifetime, whichever is shorter, for structural or major components and systems contributing to primary layer of the safety system.

Lifecycle
...

Original document and degree of correspondence
IEC TS 61400-28:2025, identical

Work material

Only members of the technical committee have access to work material. If you are a members of this technical committee you need to login to view the documents. Login