prBAS IEC TS 61400-28:2027

Wind energy generation systems - Part 28: Through-life management and life extension of wind power assets


Opće informacije
Status:Projekt
Broj stranica:108
Metoda usvajanja:Proglašavanje
Jezik:engleski
Izdanje:1.
Nadnevak realizacije:29.10.2026
Predviđeni nadnevak naredne faze:18.11.2026
Tehnički komitet:BAS/TC 56, Konvencionalni i alternativni izvori električne energije
ICS:
27.180, Sustavi turbina na vjetar

Apstrakt
IEC TS 61400-28:2025 sets out minimum requirements for actions, investigations and assessments to ensure the continued structural integrity of wind farm assets, particularly wind turbines, aimed at verifying that they remain safe for personnel to operate. The document describes how to maintain those assets and collect suitable evidence to demonstrate to third parties that risks are minimised, particularly where risks are related to collateral damage or injury, such as could be suffered by personnel or structures neighbouring the wind farm. Covered in this document are assessments of current condition and remaining useful life, resulting in the technical basis for justifying extended operation beyond the design life (defined in 3.1.3) and also beyond the site-specific assessed lifetime, whichever is shorter, for structural or major components and systems contributing to primary layer of the safety system.

Životni ciklus
...

Izvorni dokument i stepen usklađenosti
IEC TS 61400-28:2025, identičan

Radni materijal

Samo članovi tehničkog komiteta imaju pristup radnom materijalu. Ukoliko ste član, molimo prijavite se sa vašim nalogom i dobićete pristup dokumentima. Пријавите се