prBAS EN 12063:2026

Execution of special geotechnical work - Sheet pile walls, combined pile walls, high modulus walls


General information
Status:Project
Number of pages:134
Adoption method:Proglašavanje
Language:engleski
Edition:2.
Realization date:27.11.2025
Forseen date for next stage code:01.04.2026
Technical committee:BAS/TC 22, Road engineering
ICS:
93.020, Earthworks. Excavations. Foundation construction. Underground works

Abstract
This document specifies requirements, recommendations and information concerning the execution of permanent or temporary sheet pile wall, combined pile walls, high modulus wall structures and the handling of equipment and materials. This document does not give requirements and recommendations for the installation of specific parts of the structure such as ground anchorages, displacement piles and micropiles which are covered by other documents. This document is applicable to steel sheet pile walls, combined walls, high modulus walls, and synthetic sheet pile walls (composite), precast concrete and timber sheet pile walls. Tubular piles included in combined walls and high modulus walls can be filled with concrete. Composite structures such as Berliner walls and sheet pile walls in combination with shotcrete, are not covered by this document.

Lifecycle
...

Original document and degree of correspondence
EN 12063:2024, identical

Relation to BAS standards

Work material

Only members of the technical committee have access to work material. If you are a members of this technical committee you need to login to view the documents. Login