prBAS ISO 6182-2:2026
Fire protection — Automatic sprinkler systems — Part 2: Requirements and test methods for sprinkler system alarm valves, check valves, water motor alarms, retard devices and accelerators
General information
Status:Project
Number of pages:29
Adoption method:Proglašavanje
Language:engleski
Edition:4.
Realization date:15.10.2025
Forseen date for next stage code:28.10.2025
Technical committee:BAS/TC 13, Fire protection
ICS:
13.220.20, Fire protection
Abstract
Lifecycle
...
Original document and degree of correspondence
ISO 6182-2:2025, identical
Relation to BAS standards
Work material
Only members of the technical committee have access to work material. If you are a members of this technical committee you need to login to view the documents. Login