prBAS CEN/TS 18055-1:2025
Postal services - Harmonized track and trace events - Part 1: Forward flow
General information
Status:Project
Number of pages:0
Adoption method:Proglašavanje
Edition:1.
Realization date:28.01.2025
Forseen date for next stage code:11.02.2025
Technical committee:BAS/TC 5, Telecommunications
ICS:
03.240, Postal services
Abstract
The scope of this document is the forward flow of E-Commerce items. Starting point is arrival at a lo-gistic service provider, end point is the final delivery, or at least the attempt to final delivery.
The returns flows, either caused by unsuccessful delivery, "return to sender" or as a service for recipi-ents to send a received shipment back, are not covered by the forward events. To keep this document unambiguous and easy to understand, these return flows are excluded. Return flows may be covered in a separate technical specification.
Not in scope are the logistical flows within the facilities of the producers and sellers of the items. These fall outside the responsibility of the CEN/TC 331 domain.
Excluded as well, are all events necessary for an LSP to track items within its own facilities. It is up to the LSP how to run its business, and internal standards are in place for the management of internal process-es. Internal events are considered to be of no interest to a recipient, with the exception of some of the last mile events which are mentioned later in this document.
Lifecycle
...
Original document and degree of correspondence
CEN/TS 18055-1:2024, identical
Work material
Only members of the technical committee have access to work material. If you are a members of this technical committee you need to login to view the documents. Login