prBAS EN IEC 62053-41:2025
Electricity metering equipment - Particular requirements - Part 41: Static meters for DC energy (classes 0,5 and 1)
General information
Status:Project
Number of pages:32
Adoption method:Proglašavanje
Language:engleski
Edition:1.
Realization date:04.12.2024
Forseen date for next stage code:09.12.2024
Technical committee:BAS/TC 10, Electrical energy measurement equipment and load control
Directives:
2014/30/EU, Directive 2014/30/EU of the European Parliament and of the Council of 26 February 2014 on the harmonisation of the laws of the Member States relating to electromagnetic compatibility (recast)
ICS:
17.220.20, Measurement of electrical and magnetic quantities
Abstract
This part of IEC 62053 applies only to static watt-hour meters of accuracy classes 0,5 and 1 for the measurement of DC electrical energy in DC systems, and it applies to their type tests only.
NOTE 1 For other general requirements, such as safety, dependability, etc., see the relevant parts of IEC 62052 or IEC 62059.
This document applies to electricity metering equipment designed to:
- measure and control electrical energy on electrical networks with two poles where one of the poles is connected to earth and with voltage up to 1 500 V DC;
NOTE 2 There are DC networks with other configurations or with more than 2 poles (for example networks with earth and both a positive and a negative pole).
- have all functional elements, including add-on modules, enclosed in, or forming a single meter case with the exception of indicating displays;
- operate with integrated or detached indicating displays, or without an indicating display;
- be installed in a specified matching socket or rack;
- optionally, provide additional functions other than those for measurement of electrical energy.
They may be used for measuring DC electrical energy, amongst others, in the following application areas:
- in EV (electrical vehicle) charging stations or in EV charging infrastructures, if the measurement is placed on the DC side;
- in information technology (IT) server farms;
- in DC supply points for communication equipment;
- in low voltage DC networks for residential or commercial areas, if the measurement is placed on the DC side;
- in solar PV (photovoltaic) systems where DC power generation is measured;
- in DC supply points for public transport networks (e.g. trolleybus, etc.).
Meters designed for operation with low power instrument transformers, LPITs as defined in the IEC 61869 series, may be tested for compliance with this document only if such meters and their LPITs are tested together and meet the requirements for directly connected meters.
NOTE 3 Modern electricity meters typically contain additional functions such as measurement of voltage magnitude, current magnitude, power, etc.; measurement of power quality parameters; load control functions; delivery, time, test, accounting, recording functions; data communication interfaces and associated data security functions. The relevant standards for these functions may apply in addition to the requirements of this document. However, the requirements for such functions are outside the scope of this document.
Lifecycle
...
Original document and degree of correspondence
EN IEC 62053-41:2024, identical