Glossary of standardization terms
Showing 10,621-10,640 of 11,473 items.
Standardization field | Term | Term (EN) | Technical committee | |
---|---|---|---|---|
Electrical engineering | back of the hand protection | back of the hand protection | BAS/TC 52 | Details |
Electrical engineering | obstacle | obstacle | BAS/TC 52 | Details |
Electrical engineering | mounting height | mounting height | BAS/TC 52 | Details |
Electrical engineering | operating outline | operating outline | BAS/TC 52 | Details |
Electrical engineering | (electrically) skilled person | (electrically) skilled person | BAS/TC 52 | Details |
Electrical engineering | (electrically) instructed person | (electrically) instructed person | BAS/TC 52 | Details |
Non-metallic materials | free standing unit | free standing unit | BAS/TC 42 | Details |
Non-metallic materials | floor standing unit intended to be attached to the building | floor standing unit intended to be attached to the building | BAS/TC 42 | Details |
Non-metallic materials | wall hanging unit | wall hanging unit | BAS/TC 42 | Details |
Non-metallic materials | wall attachment device | wall attachment device | BAS/TC 42 | Details |
Non-metallic materials | kitchen-worktop | kitchen-worktop | BAS/TC 42 | Details |
Non-metallic materials | extension element | extension element | BAS/TC 42 | Details |
Non-metallic materials | storage area storage volume | storage area storage volume | BAS/TC 42 | Details |
Non-metallic materials | accessible part | accessible part | BAS/TC 42 | Details |
Non-metallic materials | shear and squeeze point | shear and squeeze point | BAS/TC 42 | Details |
Non-metallic materials | clear height | clear height | BAS/TC 42 | Details |
Non-metallic materials | levelling device | levelling device | BAS/TC 42 | Details |
Non-metallic materials | potential energy | potential energy | BAS/TC 42 | Details |
Non-metallic materials | overturn | overturn | BAS/TC 42 | Details |
Metallic materials | construction | construction | BAS/TC 2 | Details |