Standardization field | Non-metallic materials |
Technical committee | BAS/TC 11- Petroleum and petroleum products |
Term (EN) | dropping line, line drop |
Definition (EN) | open ing (venting to atmosphere) a tanker’s pipelines
to allow drainage into a tank(s) where any drained
material may be measured
NOTE Done prior to taking ullages, the line drop should
include all deck cargo lines, risers and drops prior to
taking ullages. When done after completion of a
discharge, it should include the vessel’s bottom cargo
lines. For the purpose of accounting, it is recommended
that the draining be confined to as few tanks as possible. |
Term (FR) | |
Definition (FR) | |
Term (DE) | |
Definition (DE) | |
Term (BS) | pražnjenje cjevovoda |
Definition (BS) | otvaranjem (odušak u atmosferu) tankerskih cjevovoda
omogućava se ispuštanje (dreniranje) materijala u
komoru(e) gdje se sav zaostali materijal može izmjeriti
NAPOMENA Ako se ova radnja vrši prije mjerenja
praznog prostora, ona bi uključivala sve cjevovode na
palubi, okomite i vertikalne. Ako se vrši nakon završetka
istovara, uključivala bi i cjevovode na dnu broda. U svrhu
mjerenja, preporučuje se da se ispuštanje ograniči na
što je moguće manji broj komora. |
Term (HR) | |
Definition (HR) | |
Term (SR) | |
Definition (SR) | |
Date | 2016-03-01 |
Standards | BAS ISO 1998-5:2000 |
---|