prBAS EN 16432-4:2027

Railway applications - Ballastless track systems - Part 4: Special ballastless track systems for attenuation of vibration


General information
Status:Project
Number of pages:0
Adoption method:Proglašavanje
Edition:1.
Realization date:23.11.2026
Forseen date for next stage code:01.12.2026
Technical committee:BAS/TC 46, Railways
ICS:
45.080, Rails and railway components
93.100, Construction of railways

Abstract
This part of EN 16432 series specifies how to integrate the particular aspects of ballastless track systems for attenuation of vibration into the system and subsystem design and component configuration according to EN 16432-2:2017. The general system and subsystem design requirements are assigned from EN 16432-1:2017. Additional noise and vibration requirements can be project specific and are not provided by this document. Acoustic requirements are considered as input for the track design from the acoustic design. The acoustic design and the track design affect each other and may require an iterative overall design process. The range of applicability covers all kind of rail systems including Urban Rail systems.

Lifecycle
...

Original document and degree of correspondence
EN 16432-4:2026, identical

Work material

Only members of the technical committee have access to work material. If you are a members of this technical committee you need to login to view the documents. Login