Showing 1-2 of 2 items.
Standard referenceStage codeBAS/TCReal dateForseen date for next stage code
  
nsBAS EN 50549-2:2024
Requirements for generating plants to be connected in parallel with distribution networks - Part 2: Connection to a MV distribution network - Generating plants up to and including Type B
40.20BAS/TC 1030.05.202401.01.1970
prBAS EN 50549-1:2024
Requirements for generating plants to be connected in parallel with distribution networks - Part 1: Connection to a LV distribution network - Generating plants up to and including Type B
10.99BAS/TC 1006.03.202407.03.2024