| Standardization field | Electrical engineering
|
| Technical committee | BAS/TC 56- Conventional and alternative sources of electrical energy |
| Term (EN) | run-on time |
| Definition (EN) | amount of time that an unintentional island condition exists, calculated as the intervalbetween the opening of the switch S1 (Figure 1) and the cessation of EUT output current |
| Term (FR) | |
| Definition (FR) | |
| Term (DE) | |
| Definition (DE) | |
| Term (BS) | vrijeme reagovanja |
| Definition (BS) | period vremena tokom kog postoji neželjeno ostrvo, koje se računa kao interval između isklapanja sklopke S1 (Slika 1) i prekida izlazne struje EUT-a |
| Term (HR) | |
| Definition (HR) | |
| Term (SR) | |
| Definition (SR) | |
| Date | 2018-01-16 |
| Standards | - |
|---|