| Standardization field | Basic standards |
| Technical committee | BAS/TC 3- Quality management and quality assurance |
| Term (EN) | duration of management system certification audits |
| Definition (EN) | part of audit time (3.16) spent conducting audit activities from the opening meeting to the closing meeting, inclusive
Note 1 to entry: Audit activities normally include:
conducting the opening meeting;
performing document review while conducting the audit;
communicating during the audit;
assigning roles and responsibilities of guides and observers;
collecting and verifying information;
generating audit findings;
preparing audit conclusions;
conducting the closing meeting.
|
| Term (FR) | |
| Definition (FR) | |
| Term (DE) | |
| Definition (DE) | |
| Term (BS) | |
| Definition (BS) | |
| Term (HR) | |
| Definition (HR) | |
| Term (SR) | trajanje sertifikacionih provjera sistema upravljanja |
| Definition (SR) | dio vremena provjere (3.16) utrošen za sprovođenje aktivnosti provjere od uvodnog sastanka do završnog sastanka, uključujući i ove sastanke
NAPOMENA 1 u vezi s ovom tačkom: Aktivnosti provjere obično obuhvataju:
održavanje uvodnog sastanka;
preispitivanje dokumenata tokom sprovođenja provjere;
komuniciranje tokom provjere;
dodjeljivanje uloga i odgovornosti vodičima i posmatračima;
sakupljanje i verifikovanje informacija;
generisanje nalaza provjere;
pripremanje zaključaka provjere;
održavanje završnog sastanka.
|
| Date | 2017-12-11 |
| Standards | BAS EN ISO/IEC 17021-1:2017 |
|---|