Glossary of standardization terms
Standardization field | Construction |
---|---|
Technical committee | BAS/TC 37- Fire safety in buildings |
Term (EN) | phased evacuation |
Definition (EN) | process by which different parts of a built environment (4.26) are evacuated in a controlled sequence EXAMPLE In a multi-storey building, the initially evacuated floors are usually the fire (4.98) floor, the floor immediately above, the floor immediately below, and all basement floors. NOTE Those parts expected to be at greatest risk are evacuated first. |
Term (FR) | |
Definition (FR) | |
Term (DE) | |
Definition (DE) | |
Term (BS) | evakuacija u fazama |
Definition (BS) | proces kojim se različiti dijelovi izgrađene sredine (4.26) evakuiraju u kontrolisanoj sekvenci PRIMJER U višespratnoj zgradi spratovi koji se prvo evakuiraju su sprat zahvaćen požarom (4.98), sprat iznad njega, sprat ispod njega i svi podzemni spratovi. NAPOMENA Dijelovi koji se smatraju najviše ugroženim se prvi evakuiraju. |
Term (HR) | |
Definition (HR) | |
Term (SR) | |
Definition (SR) | |
Date | 2016-05-17 |
Standards | BAS EN ISO 13943:2015 |