Prikazuj 1-14 od 14 stavki.
Oznaka standardaFaza izradeBAS/TCNadnevak realizacijePredviđeni nadnevak naredne faze
  
nsBAS EN 60127-2/A1:2025
Miniature fuses - Part 2: Cartridge fuse-links
40.20BAS/TC 1813.05.202506.07.2025
nsBAS EN 60269-6/A1:2025
Low-voltage fuses - Part 6: Supplementary requirements for fuse-links for the protection of solar photovoltaic energy systems
40.20BAS/TC 1813.05.202506.07.2025
nsBAS EN IEC 60076-22-7/Cor1:2025
Power transformers - Part 22-7: Power transformer and reactor fittings - Accessories and fittings
40.20BAS/TC 1813.05.202506.07.2025
nsBAS EN IEC 60127-1:2025
Miniature fuses - Part 1: Definitions for miniature fuses and general requirements for miniature fuse-links
40.20BAS/TC 1813.05.202506.07.2025
nsBAS EN IEC 60127-6:2025
Miniature fuses - Part 6: Fuse-holders for miniature fuse-links
40.20BAS/TC 1813.05.202506.07.2025
nsBAS EN IEC 60127-8/A1:2025
Miniature fuses - Part 8: Fuse resistors with particular overcurrent protection
40.20BAS/TC 1813.05.202506.07.2025
nsBAS EN IEC 60404-8-1:2025
Magnetic materials - Part 8-1: Specifications for individual materials - Permanent magnet (magnetically hard) materials
40.20BAS/TC 1813.05.202506.07.2025
nsBAS EN IEC 60691/A1:2025
Thermal-links - Requirements and application guide
40.20BAS/TC 1813.05.202506.07.2025
nsBAS EN IEC 60691:2025
Thermal-links - Requirements and application guide
40.20BAS/TC 1813.05.202506.07.2025
nsBAS EN IEC 61558-2-10:2025
Safety of transformers, reactors, power supply units and combinations thereof - Part 2-10: Particular requirements and tests for separating transformers with high insulation level and separating transformers with output voltages exceeding 1 000 V
40.20BAS/TC 1813.05.202506.07.2025
nsBAS EN IEC 61812-1:2025
Time relays and coupling relays for industrial and residential use - Part 1: Requirements and tests
40.20BAS/TC 1813.05.202506.07.2025
nsBAS EN IEC 62314:2025
Solid-state relays - Safety requirements
40.20BAS/TC 1813.05.202506.07.2025
nsBAS EN IEC 63522-8:2025
Electrical relays - Tests and measurements - Part 8: Timing
40.20BAS/TC 1813.05.202506.07.2025
nsBAS IEC 60076-7:2025
Power transformers - Part 7: Loading guide for mineral-oil-immersed power transformers
40.20BAS/TC 1813.05.202506.07.2025