prBAS EN IEC 61784-5-19:2025

Industrial networks - Profiles - Part 5-19: Installation of fieldbuses - Installation profiles for CPF 19


Opšte informacije
Status:Projekt
Broj stranica:0
Metoda usvajanja:Proglašavanje
Izdanje:1.
Datum realizacije:23.12.2024
Predviđeni datum naredne faze:01.01.2025
Tehnički komitet:BAS/TC 51, Automatika
ICS:
25.040.40, Mjerenje i upravljanje u industrijskim procesima
35.100.40, Prijenosni sloj

Apstrakt
<!-- NEW! -->IEC 61784-5-19:2024 is available as <a href="https://webstore.iec.ch/publication/93717">IEC 61784-5-19:2024 RLV</a> which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.</br></br>IEC 61784-5-19:2024 specifies the installation profile for CPF 19 (MECHATROLINKTM[1]). The installation profiles are specified in the annexes. These annexes are read in conjunction with IEC 61918:2018, IEC 61918:2018/AMD1:2022 and IEC 61918:2018/AMD2:2024. [1] MECHATROLINKTM and Σ-LINKTM II are trade names of YASKAWA ELECTRIC CORPORATION. This information is given for the convenience of users of this document and does not constitute an endorsement by IEC of the trade names holder or any of its products. Compliance to this profile does not require use of the trade names. Use of the trade name requires permission of the trade name holder.

Životni ciklus
...

Izvorni dokument i stepen usklađenosti
EN IEC 61784-5-19:2024, identičan

Veza sa BAS standardima

Radni materijal

Samo članovi tehničkog komiteta imaju pristup radnom materijalu. Ukoliko ste član, molimo prijavite se sa vašim nalogom i dobićete pristup dokumentima. Prijavite se