prBAS EN ISO 5124:2025
Loading and unloading of liquefied natural gas (LNG) tank wagons and containers (ISO 5124:2024)
Opšte informacije
Status:Projekt
Broj stranica:10
Metoda usvajanja:Proglašavanje
Jezik:engleski
Izdanje:1.
Datum realizacije:21.10.2024
Predviđeni datum naredne faze:28.10.2024
Tehnički komitet:BAS/TC 31, Gas i gasna tehnika
ICS:
75.200, Nafta, naftni proizvodi i oprema za rukovanje prirodnim gasom
Apstrakt
This document provides requirements and recommendations for the design, construction and operation of newly installed liquefied natural gas (LNG) railway loading and unloading facilities for use on onshore LNG terminals, LNG satellite plants, handling LNG tank wagons or tank containers engaged in international trade.
The designated boundary limits of this document are between the LNG terminal’s inlet/outlet piping headers at the beginning of the rail loading or unloading area and the rail track area used for LNG tank wagons and containers. It is applicable to all rail loading bays, weighbridge(s) and related subsystems.
Životni ciklus
...
Izvorni dokument i stepen usklađenosti
EN ISO 5124:2024, identičan
ISO 5124:2024, identičan
Radni materijal
Samo članovi tehničkog komiteta imaju pristup radnom materijalu. Ukoliko ste član, molimo prijavite se sa vašim nalogom i dobićete pristup dokumentima. Prijavite se